Agent Pricing Engine · Data Center Pods

Data center pods,
quoted by conversation.

Say “1 MW, two rows of 20 racks at 25 kW, N+1” — the engine sizes the racks, containment, power train and cooling together and prices the pod as one BOM. Every number comes from your rules — never from a guess.

Racks, containment, power train and cooling sized together: kW per rack drives PDUs, UPS under N+1 or 2N, generators, CRAH and CDU.

What it sizes together

Built for pod, e-house and power-skid builders quoting first-pass sizing on bids where estimating time is the scarcest resource.

Sign up free → Book a demo →

Free to use — Nteli is paid only when an order is won through it.

The engine is a full MCP server — connect it to Claude and your team quotes data center pods in plain conversation, on a rule pack built from twenty years of configuring these products. Override the pack with your own rules, governed and audited — and you're onboarded.

Try it in Claude — right now.

Connect the engine as a custom connector (two steps, shown here), then paste any of these. They were run on the live engine; prices are illustrative until your price book loads.

“Quote a 1 MW pod: two rows of twenty racks at 25 kW, N+1, rear-door heat exchangers, 480 V utility, 65 kA, 18 °C chilled water, slab.”

What you’ll see: The full power train and cooling sized from one line: UPS, generators, transformers, switchgear, busway, rack PDUs and CDUs — each checked for capacity after redundancy.

“Price an 800 kW GPU pod: two rows of ten 40 kW GPU racks, direct-to-chip liquid cooling, 2N, 480 V, 65 kA, warm-water 32 °C loop.”

What you’ll see: 2N doubles the A and B paths (UPS, transformers, switchgear); CDUs carry the liquid load and CRAH units the air remainder. Every capacity is shown against its limit.

THEN ASK — same chat as the prompt above
“What changes if that GPU pod goes N+1 instead of 2N?”

What you’ll see: The engine re-sizes the whole train for the new redundancy and shows the price difference.

The engine also quotes
Safety & Plumbing Equipment Hazardous-Area Electrical Commercial HVAC Pumps & Packaged Skids Lab Furniture & Fume Hoods Fire Doors & Hardware Cooling Towers Medical Gas & Headwalls Water Treatment Kitchen Ventilation Cranes & Hoists Commercial Boilers Control Panels & Switchgear Electronic Components & Assemblies

The four manufacturing levers  ·  Estimate your leak ledger  ·  The benchmark rates, with the math  ·  The Leak Ledger Workshop  ·  Guide: pod estimating

Skeptical? Send us a real RFQ.

One you quoted recently, names removed. You’ll get back what the engine produces — compare it with yours. No deck, no pitch.

Email an RFQ →